Wind Park Oude Mol

Wind Park Oude Mol

 
Realising complete Electrical design (DO/UO) for 50kV cable layout and 33kV substation for Wind Park Oude Mol, including coordination on Civil engineering.

Description

- Design-documents for DO and UO Electrical
- SLD, Load flow-, Short circuit-, Selectivity-, Step and Touch voltage- and Earthing-studies.
- Datasheets installations and components.
- Coordination Civil engineering foundations substation.
- Verification and validation on documents.

Curious about another successful project?

 

We make the connection